Industries / Railways

Wildfire intelligence for railways.

Railroads rely on us to understand corridor risk in changing fire weather, plan right-of-way mitigation, reconstruct what happened when a fire starts near the line, and see where floodwater and debris will reach the track, burn scar or not.

Aerial imagery of a river valley with an illustrative corridor line and one flagged crossing drawn over it
Illustrative
Fig. 01 / How a corridor and a flagged crossing are drawnImagery: USGS NAIP / Overlay illustrative

01 / The questions you face

Along the line, before and after a fire.

  1. 01Where along our network is wildfire risk highest, and in which weather?
  2. 02Where should right-of-way mitigation go first?
  3. 03When a fire starts near the tracks, what does the evidence show?
  4. 04How do we capture the scene before it changes?
  5. 05After a fire, which culverts, bridges, and crossings face washouts and debris flow?
  6. 06Will our analysis hold up to outside review?
ORIGIN AREAMAIN LINE

Illustrative map: a rail line, an ignition point beside it, the fire’s spread as time contours, and field indicators that point back to the origin area.

FIG. 02  Reconstructed spread from a point near the lineILLUSTRATIVE / PASS 00

02 / How we help

One partner for corridor risk, the scene, and the water.

Before

Corridor risk and mitigation planning

Risk forecasts along the network from field-verified fuels and fire weather. Vegetation mapping shows where risk is negligible, where it is low, and where right-of-way mitigation is worth the most.

Risk and prevention →
During

Scene documentation

Your teams or ours document the scene with the field app while evidence is still there, online or off.

The software →
After

Reconstruction and washout exposure

Origin, progression, and impact analysis for planning, mitigation, and defense, with expert support; then flooding and debris flow at culverts, bridges, and crossings.

Reconstruction →

03 / How an engagement runs

  1. 01Confidential intakeA private first conversation; what you share stays with us.
  2. 02ScopeQuestions, sources, timeline, and deliverables agreed.
  3. 03Field and analysisEvidence collected and corroborated on one timeline.
  4. 04FindingsReport, exhibits, and a briefing for your team.

Burned slopes above the line send water and debris to the track.

Washout and debris flow exposure, after the fire

Imagery: USGS NAIP / Animas Valley, Colorado

04 / Ways to work with us

  1. 01One-time assessmentA risk and mitigation report for a corridor, subdivision, or right-of-way.
  2. 02Ongoing programA risk map plus the field app. Crews document each mitigation action, so the risk picture and the insurer-facing record stay current.
  3. 03HybridRecurring analysis, quarterly for example, delivered through the platform, with software included.

Tell us what you need to know.

Talk with our rail teamIn confidence / Response within one business day

Start with a test case. Bring us a property, corridor, watershed, or event; we'll show you what we can do with it. Send a test case →

Imagery: USGS NAIP